Emergency work to repair a damaged sewer on High Street in Boston, near the junction with Whitehorse Lane and Liquorpond Street, will begin tomorrow (Wednesday 14 November) and last for approximately three weeks.

A full road closure will be in place on High Street, near the junction of Whitehorse Lane and Liquorpond Street, with a diversion route in place for road users. Local traffic will be diverted via John Adams Way and London Road onto the High Street. However, access for residents and emergency services will be maintained throughout the duration of the repair.

Regan Harris from Anglian Water said: “We’re really sorry for any inconvenience this causes to our customers. We are using a tanker during the day to ensure customers can continue to use their toilets and washing machines as normal. This will be in place until the pipe has been repaired and used water can be taken away as normal.

“Our team will be on site between 8.30am and 4pm during the week with weekend work, if required, to ensure we complete this essential work as quickly as possible.”

ENDS

 For more information contact: Anglian Water press office 0871 677 0123

 Join our campaign for the future. It’s called Love Every Drop.
You can take part at a tap near you.
www.anglianwater.co.uk/loveeverydrop

Posted by Anglian Water